Projects of frame panel houses with a garage. Where to see projects of frame houses and cottages with a garage and veranda. Construction of a garage from foam blocks

Projects frame houses with a garage are in high demand among private developers. After all, according to financial costs and labor intensity, such projects are the most economical, and the presence of a parking space significantly increases the level of comfort. For example, one-story frame cottage with a garage will cost 1.5-2 times less than a brick one of the same size.

Features of frame buildings

The principle of frame technology is that a post-and-beam structure is erected from wood, and the walls are filled with economical thermal insulation materials. Modern frame construction multilayer. The basis of the walls is a wooden frame, on which both sides are covered with cladding (DSP, chipboard, OSB or wood) and insulation.

Advantages of frame house construction:

  • A small one does not require a massive foundation, usually a cheap columnar one is sufficient. When two-story building needed .
  • Using wood as the main material for construction reduces the load on the foundation. However, challenges arise fire safety the buildings.
  • It is possible to use any type of heating, but taking into account fire safety. Helps reduce the risk of fire treatment wooden parts special substances - fire retardants, increasing fire retardant properties. Non-combustible materials should be used as thermal insulation.
  • Frame houses with an extension are practically not subject to shrinkage, so you can immediately begin finishing external and internal walls. Most often for exterior finishing choose siding, plaster or lining.

They try not to use a cement screed in such houses so as not to increase the load on the foundation. In addition, it is necessary good insulation wooden structures from wet processes.

At any stage of operation, you can make a residential or commercial extension to a frame house with your own hands, expanding the area and capabilities of the building.

Projects of frame houses with a garage

If you are just planning to build a frame house, then immediately choose a project with a garage, even if the family does not yet have a car. This is much more profitable than later building a garage separately or attaching it to a previously built house. In the general structure it is easier to organize heating, lighting and ventilation in the garage.

How to attach a garage to a house

Adding a garage to an existing house is possible in the following ways:

  • Organization of an entrance from the street without the possibility of entering the garage from the main building. This is the most safe way, but in this case you will have to give up some convenience.
  • An extension, which is supposed to be entered from both the street and the house. In this case, at the entrance from the main building, there should be an organized ventilated vestibule, which will protect the house from noise and exhaust gases.
  • Construction of a carport for parking a car. Sufficient protection from precipitation, saving money and area. It is better if there is a wall covering the parking space from the side of precipitation.

The minimum pressure on the ground allows you to attach a garage to a frame house in close proximity without the risk of subsidence and deformation of the base. The foundation for the extension does not have to be the same as that of the main building. For small garages, the most common choice is columnar or strip foundation. Walls can be erected using the same frame technology. An equally popular option is walls made of foam blocks.

Advantages and disadvantages of a wooden garage

A garage made of timber or other wooden material is rare. But if we are talking about building a garage and a frame house with your own hands, this option is quite acceptable.

A wooden extension has the following positive properties:

  • affordable price;
  • possibility of building with your own hands;
  • durability;
  • the ability to attach to any building, it does not have to be a frame house;
  • low operating costs;
  • environmental friendliness of the material (wood);
  • wooden garage The simplest one will do - columnar.

However, wooden buildings there is also significant shortcomings:

  • the risk of fire is higher than in other types of houses;
  • wood absorbs moisture; if ventilation is poor, this can cause mold;
  • poor sound insulation of walls and ceilings;
  • attractive to rodents and pests.

Pros and cons of building a garage from foam blocks

The most popular material, which is most often chosen by private developers for extensions to a cottage, is foam blocks. To build a garage from foam blocks with your own hands, you do not need special equipment or experience in construction. In addition, the cost of a block structure is often lower than the cost of construction from other materials.

There are many advantages to adding a garage made of foam blocks:

  • ease of installation;
  • high-quality sound insulation;
  • fire resistance;
  • excellent thermal insulation properties;
  • environmental friendliness (in second place after wood);
  • ease of drilling and processing;
  • rot resistance.

In addition, it is important to know what disadvantages are typical for a garage made of foam blocks:

  • Fragility. On the one hand, due to its fragility, the block can be easily processed, on the other hand, this can lead to cracks.
  • An extension made of foam blocks shrinks by 2-3 mm per meter, so you will have to wait at least six months for finishing.
  • High water absorption of foam blocks.

Frame house with garage and attic wooden materials more appropriate than foam blocks. Such a building has a more harmonious appearance, although the difference can always be hidden with external decoration.

DIY frame garage construction

Examples of frame houses with a garage can easily be found on the Internet. Main question- How to build such a structure correctly.

Construction stages

The main and attached buildings transmit different loads on the ground, as a result of which the buildings can shift relative to each other. It follows from this that the attachment of the extension to the wall of the main building should not be rigid. For this purpose they provide expansion joint, which, roughly speaking, is the gap between the house and the garage.

In the construction of an extension with your own hands the following stages are distinguished:

  1. Preparing the base.
  2. Construction of the foundation.
  3. Roof installation.
  4. Frame covering.
  5. Gate installation.
  6. Interior decoration.

Preparing the base and pouring the foundation

First of all, it is necessary to remove the plant layer of soil (about 15 cm). Then the site for the construction of a frame garage is leveled and laid out. The main task of laying out the foundation is to determine the location of the axes of the structure being added. Wooden stakes are usually used to secure the axles to the ground.

Next, a pit is dug according to the shape of the foundation, a mixture of sand and gravel is poured onto the bottom, and then a layer of rubble is poured. Minimum height The layer of sand and gravel cushion and rubble is 15 cm, but not more than 25 cm. For the foundation of an extension to a house, a depth of up to 60 cm is sufficient.

Formwork is installed around the perimeter of the foundation pit dug. Then from reinforcing bars the frame is formed and the concrete solution is poured.

After the foundation is built, the piping is done. Bottom harness extensions are made from boards 100x50 millimeters. For garage doors and corner posts, you can use timber with a section of 100x100 millimeters. Vertical racks installed in increments of 60 cm, which avoids difficulties when laying insulation. The pitch of the rafters and floor joists is also taken to be 60 cm. The upper trim is performed in the same way as the lower one.

Roof structure

For the roof of an extension to a house, boards of 100x25 millimeters are suitable. On outer wall they support the mauerlat to which the rafters are attached. Then the waterproofing is laid and the sheathing is installed on top of it.

When laying the rafters, you need to make a roof joint existing house with a garage roof. To do this, the rafters of the extension are attached to rafter system roofs of a previously constructed building.

To cover the roof when building an extension with your own hands, you should use flexible materials(corrugated sheeting with a section height of less than 10 mm, soft tiles).

Frame covering

Any frame structure must be securely protect from moisture. Used for cladding sheet materials, siding, lining or edged boards. Ideally, you need to buy the same material as for the facade of the house.

Gate installation

Most often for a garage from wooden frame choose swing double-leaf gates. To save space and convenience, you can install lift-type gates. For example, automatic sectional or overhead gates.

Interior decoration

The most common option used to decorate the inside of garage walls is plasterboard sheathing. Suitable here GKLVO– moisture-resistant plasterboard sheets with fire protection. They can be recognized by their gray-green color and red markings.

Plasterboard walls can be finished with any suitable material, for example, to plaster decorative compositions or paint.

Video: technology for constructing a frame garage

Projects one-story houses with a garage are extremely popular today. Russians increasingly prefer this housing model. Houses with a garage are a real godsend: it’s so convenient in the autumn-winter to put the car in a heated room, finding yourself practically immediately warm. This will make your life even more comfortable.

Take advantage of the advantages of such houses - order project development from professionals! We make projects of frame houses with a garage quickly and efficiently.

House designs and features of buildings with a garage

Such housing is characterized by simplicity of design, good layout and large enough area for an average family. By choosing a one-story option with a garage, you get a lot of advantages:

  • wide planning possibilities;
  • low cost buildings that characterize frame houses; IN
  • warm, spacious housing;
  • reliable and free car storage.

This type of house has a compact and functional layout. You always have fast access to the garage area, which is especially important in bad weather. This layout of the premises on one level creates a certain comfort in their use.

Thoughtful designs of houses with a garage allow you to manage the territory very economically, even small area. The company's specialists Summer season» will help you choose the most optimal layout based on your preferences and budget. In addition, house projects with such a solution will cost much less than the construction of a separate building for parking a car.

The catalog contains great amount project options. All of them are distinguished by a functional, well-thought-out layout, good heat and sound insulation, environmentally friendly materials and affordable prices. When choosing a project in combination with a garage space, Special attention It is worth paying attention to the presence of a vestibule, which will prevent unwanted odors from entering the living area. The vestibule will create additional air gap, retaining heat.

The garage must be spacious, and house designs must take this into account: you must comfortably get into and out of the car, opening the doors freely and without damaging their coating. Among other things, the garage allows you to successfully place boiler equipment for cottages, without taking up useful space inside. But the main advantage of such a “neighborhood” is secure storage of the car and, consequently, your peace of mind. Designing frame houses with a garage is a job for our professionals!

On our website you can also see a variety of design solutions for houses with a garage. Projects two-story houses with a garage are best suited for a comfortable life big family. Choose a frame house to create quality conditions!

Frame houses with a garage can solve two problems at once: provide a family with comfortable living quarters and provide an individual parking space for the car enthusiast.

In the Russian Construction company you can order the construction of a frame house with a garage according to an individual project. We guarantee optimal timing and high quality of all work, for which we provide a 1-year guarantee. In addition, we provide free delivery of our products to the Ring Road and MKAD.

Advantages of frame houses from Russian Construction

On the pages of our website you can choose many house designs that will become comfortable housing for both you and your car. After carefully considering the layouts, you will definitely choose the best option for your family. Frame houses, which are actively being built in Russia and abroad, have a number of characteristic features, which determined their popularity:

  • Fast construction. Only 2-3 weeks are required for construction of even the largest and most complex projects. In this case, you can move into the new building immediately upon completion of the work.
  • Insulation around the entire perimeter and special attention to the corners ensure that the house remains warm, which opens up luxurious prospects for saving on heating costs.
  • Reasonable rates. Frame houses are much cheaper than block and brick houses, but are absolutely not inferior to them in terms of performance characteristics.
  • You will avoid additional costs for finishing facades, since wood paneling looks very aesthetically pleasing.

When ordering a frame house from us, you always have the opportunity to choose an individual layout or adjust an existing project at your discretion. The result of construction will be the embodiment of your dream of comfortable and spacious housing.

Built country house using frame technology plus small veranda. The cost turned out to be quite economical, and the time frame was 3 and a half months. We even finished it a couple of weeks earlier than promised. We only go to the dacha in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you very much for building a house made of aerated concrete. The quality of both the material and work is excellent - FRIENDS WILL BE JEALOUS. Time frame for completed work: a house was built from scratch in approximately 4.5 months. Good luck to all of you, good clients and big houses!!


They built our house in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration in the fall), it wasn’t cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse together with them! Thank you for such professional guys that you provided us with!


Thank you so much for your work and attitude! Everything is efficient, high quality, fast! Thanks to the team led by Alexey!


The company built me ​​a great one summer house! I don’t have any complaints about the company; next summer I’m going to build a bathhouse and a garage. I’ll definitely contact them. Thanks to everyone, especially Sergei’s team, who built it for me, a lot depends on them!


We built a house from aerated concrete in your company - I’m very pleased. The house was erected on our pre-prepared foundation in 45 days. And as a gift we received home insurance for a year. So I recommend it.


In August 2017 I ordered the foundation ( monolithic slab) for a house in the Leningrad region. In 2018 I already ordered the house itself. I can recommend it because... We were pleased with the result. Everything was done quickly and professionally.


We ordered a house and garage from this company in the summer of 2016. The builders worked for about 4 months, without a break (they really liked it). Everything was done according to the agreement, no extra money was asked.


Frequently asked questions before construction

About company

How long has your company been in business?

Our company began work as a repair and finishing company in 2007. From that moment on, we have grown into the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

How is the competence of specialists confirmed?

All architects and engineers of the company have qualification certificates. Because the project is not subject to a company license, but to an architect’s certificate. By law, responsibility for the project lies with the architect.

Does your company do all the work? Or do you use contractors?

  • We ourselves carry out general construction, Finishing work, site arrangement, wiring engineering systems(electricity, heating around the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Searching, attracting, complying with agreements and monitoring the performance of work by contractors is our task.
  • We carry out 80% of all work on the construction of your home ourselves and only 20% involve contractors.
  • We enter into an agreement with each contractor in which he specifies a guarantee for the work performed by him, and in case of malfunctions, their elimination is the responsibility of the contractor.

Is it possible to see objects that are currently in operation?

Yes, there are objects that we can show at different stages works and already completed houses by prior arrangement.

about the project

Should I buy a standard project or order an individual one?

Buy a ready-made project.

  • Plus is the price.
  • The downside is that it will not include all your wishes regarding materials and layouts. Also, it will require modification to suit the characteristics of your site.

Buy a ready-made project and modify it.

It all depends on the changes you want to make. It is possible that developing an individual project will be more profitable for you than modifying a standard one.

The cost of such modifications must be discussed during the meeting.

Development individual project Houses.

  • Pros: all your wishes regarding all characteristics of the house and site are taken into account.
  • The downside is that the cost of such a project is higher than a standard one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free for you.

How is an individual project developed?

  • The development of an individual project begins with the signing of a contract and the first meeting with the architects, at which the client voices his wishes. Based on the results of the meeting, a design assignment is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move next. Over the entire design period, several meetings take place with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a working draft is developed. This is the calculation phase of each design solution in which the client is not involved.
  • This entire process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when submitting documents for a building permit.

About construction

Will you go to the site where construction is planned?

Yes. When inspecting the site, we take into account the size, access from the road and its width, the proximity of neighboring buildings, the presence of a slope or drop, cardinal directions and what kind of soil is on the site.

Do you help with choosing a site for construction?

Yes. Our specialists help with site selection. They will help you find it according to your requirements on the Internet with advertisements.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, entry conditions, location
  • materials used in construction
  • house architecture features
  • work conditions (working time restrictions)

What guarantees do you provide?

We provide a 3-year guarantee on our work. The manufacturer provides a guarantee for materials and it is different in each case. There are materials for which the manufacturer provides a lifetime warranty.

How can I control construction?

  • We send each client step by step photo work report.
  • We install online video surveillance of the facility 24 hours a day, you and the company’s specialists have access to it (paid service).
  • You can also use the services of companies that provide technical control.
  • The construction is carried out in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the estimate has been developed and approved.

When should I pay for your work?

For design, an advance payment is required within 5 days after signing the contract in the amount of 70% of total amount. The balance is paid upon delivery of the finished project to the client.

Payment for construction is broken down according to the stages specified in the estimate. Each stage of construction is also divided into payments, the size of which may vary (usually due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders near the construction site, suitable for garden house, construction trailer, an old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will accommodate our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a power of at least 5 kW and technical water.

If this is not the case, then we will bring our generators FREE OF CHARGE. In most cases, water wood construction used only for household needs, we will provide its delivery on our own.

What time of year do you carry out construction?

We build all year round, one of important conditions V spring-autumn period This is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save by correctly calculating the estimate and choosing high-quality materials.

Perform quality project documentation, thanks to which you can not worry about accepted Constructive decisions.

We work throughout the Moscow region

Volokolamsk district, Voskresensky district, Dmitrovsky district, Yegoryevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomna district, Krasnogorsky district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Lyuberetsky district, Mozhaisky district, Mytishchi district, Naro-Fominsk district, Noginsky district, Odintsovo district, Ozersky district, Orekhovo- Zuevsky district, Pavlovo-Posadsky district, Podolsk district, Pushkinsky district, Ramensky district, Ruza district, Sergiev Posad district, Serebryano-Prudsky district, Serpukhovsky district, Solnechnogorsk district, Stupinsky district, Taldomsky district, Chekhovsky district, Shatursky district, Shakhovsky district, Shchelkovsky district.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    exterior decoration: walls are insulated with basalt facade insulation and plastered, finishing elements made of wood, manufactured locally, based on technical specifications visualization, painted. The base is laid out decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with already finished Project your future home! Our team liked the project - it’s so unusual and stylish solutions It's always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made in our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are made according to individual order and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family it was exactly this not an easy task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a design was made that took into account old layout, but had a new one modern form with interesting innovations! The house now has an entrance area where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our area. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, built-up roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family - decorated our photo gallery in the section country architecture in high-tech style, the style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow quickly and in own home There are many opportunities in nature and Fresh air. We, in turn, were glad to work on an individual house project in classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our current construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations according to preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a difficult and expressive country project With spacious premises and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also, the exact timing of construction was important for Dmitry; in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden wooden beams, in places of large spans, installation of LVL beams. The basement floor is insulated with 200mm basalt insulation; interfloor covering with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with 100 mm basalt facade slabs, the facades are closed facing bricks; color scheme proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! The choice of technology, long work on the project, construction of the foundation, construction of the house with exterior finishing and then work on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also worked on the estimate for a long time, combining different variants finishes, comparing their costs. This allowed me to choose best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation was erected - USHP. Next, work began on the box. Frame house with 200 mm insulation along the entire contour and unique technology roof insulation 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the proud owner own home and move to a new home for permanent residence, first of all, you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received a gift of reinforced concrete floors, one of the leading construction teams and a house according to the design he liked, which stood on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house for good people and they recommended us to someone else to a good person! Rumyantsev Andrey came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings... It was decided to build the house from aerated concrete blocks so that the future country handsome man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone house construction - warm, affordable, beautiful, reliable. Modern technologies have stepped forward so much that such unique configurations become available in a short time, because we built this project in winter months. The main thing is to have the necessary knowledge and constantly replenish it!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on visualizations added façade panels under the Tolento stone. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    The owner of a house “brought to life according to his idea and sketch!”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, work on a new stylish project It’s always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so an indispensable attribute of the future house was a dizzying terrace (51.1 m2) and large balcony oriented to beauty! Vladimir wanted to relax in nature in wooden house, and it was necessary to build a house in a short time and ideal solution became for such tasks frame technology construction! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

    It all started with an individual project found by the Customer’s family on a European website. It was with him that she came to our office for the first time. We made preliminary calculations for the project, took a tour of the existing construction site, shook hands and work began to boil! The architect improved and adapted the project to the site and the Client’s family; the foreman “planted” the house on the site. Based on geological surveys, it was decided to place the house on bored piles. The frame grew in a few weeks, then the roofing, insulation, exterior finishing! Behind winter period a house grew on the site. The customer invited a third-party technical supervisor who monitored the process independently of our multi-stage control. The color scheme for painting the imitation timber was selected by our manager and here in front of us is the bright and cozy country house of the Pushkov family’s dreams!