House project 5 by 9 two-story. Timber houses from the Russian timber company. Buy a ready-made project

Build frame house 5x9 is advisable in narrow areas when it is not possible to choose another shape due to the small amount of free space. On average, the housing is quite spacious and comfortable. In the future, if necessary, the house can be slightly expanded by adding an extension of the required size. If you have any doubts about the correctness of your choice, dispel them by studying more detailed information about frame buildings.


Frame house 5x9 – best option by all indicators

Frame houses have many advantages. It especially stands out against the background of which the comfortable temperature is both in summer and in winter. This is due to the special method of insulating the frame and the use modern materials and technology. The PROEKTSTROY-P company pays maximum attention to this aspect, because the quality of housing directly depends on the method of thermal insulation, which also performs the function of sound insulation.

The structure is not only strong, but also durable. The frame is treated with impregnations that prevent the appearance of fungus and minimize the impact of adverse factors. "PROJECTSTROY-P" uses and reinforced floors, and also makes the walls thicker. All buildings fully comply with established standards and are therefore safe.

The most important thing when choosing a project is to take into account your capabilities and needs. If you want your home to be ready as soon as possible and don't want to spend too much money on development, then opt for standard projects, which are presented in the catalog and on the PROEKTSTROY-P website. More demanding clients can order development individual project, which will meet the stated requirements as accurately as possible.

Our company cares about the comfort of each client and values ​​your and our time, so we provide high-quality services for optimal prices. You will not be in for an unpleasant surprise upon completion of construction, because we announce the full cost after choosing a project and drawing up a contract. Even if unexpected expenses arise, they will be minimal. Contact our office directly if you want to have a truly high-quality, reliable and durable 5x9 meter frame house. We will start implementing the project in a short time!

Go to:

1. Calculator for calculating frame houses with an attic floor
2. Frame house construction technology
3. The cost of building frame houses with a turnkey price

6. Foundation for a frame house


9.

Built country house By frame technology plus small veranda. The cost turned out to be quite economical, and the time frame was 3 and a half months. We even finished it a couple of weeks earlier than promised. We only go to the dacha in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you very much for building a house made of aerated concrete. The quality of both the material and work is excellent - FRIENDS WILL BE JEALOUS. Time frame for completed work: a house was built from scratch in approximately 4.5 months. Good luck to all of you, good clients and big houses!!


They built our house in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration) , it didn’t turn out cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse together with them! Thank you for such professional guys that you provided us with!


Thank you so much for your work and attitude! Everything is efficient, high quality, fast! Thanks to the team led by Alexey!


The company built me ​​a great one summer house! I don’t have any complaints about the company; next summer I’m going to build a bathhouse and a garage. I’ll definitely contact them. Thanks to everyone, especially Sergei’s team, who built it for me, a lot depends on them!


We built a house from aerated concrete in your company - I’m very pleased. The house was erected on our pre-prepared foundation in 45 days. And as a gift we received home insurance for a year. So I recommend it.


In August 2017 I ordered the foundation ( monolithic slab) for a house in the Leningrad region. In 2018 I already ordered the house itself. I can recommend it because... We were pleased with the result. Everything was done quickly and professionally.


We ordered a house and garage from this company in the summer of 2016. The builders worked for about 4 months, without a break (they really liked it). Everything was done according to the agreement, no extra money was asked.


Frequently asked questions before construction

About company

How long has your company been in business?

Our company began work as a repair and finishing company in 2007. From that moment on, we have grown into the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

How is the competence of specialists confirmed?

All architects and engineers of the company have qualification certificates. Because the project is not subject to a company license, but to an architect’s certificate. By law, responsibility for the project lies with the architect.

Does your company do all the work? Or do you use contractors?

  • We ourselves carry out general construction, finishing work, site arrangement, wiring engineering systems(electricity, heating around the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Searching, attracting, complying with agreements and monitoring the performance of work by contractors is our task.
  • We carry out 80% of all work on the construction of your home ourselves and only 20% involve contractors.
  • We enter into an agreement with each contractor in which he specifies a guarantee for the work performed by him, and in case of malfunctions, their elimination is the responsibility of the contractor.

Is it possible to see objects that are currently in operation?

Yes, there are objects that we can show at different stages works and already completed houses by prior arrangement.

about the project

Should I buy a standard project or order an individual one?

Buy finished project.

  • Plus is the price.
  • The downside is that it will not include all your wishes regarding materials and layouts. Also, it will require modification to suit the characteristics of your site.

Buy a ready-made project and modify it.

It all depends on the changes you want to make. It is possible that developing an individual project will be more profitable for you than modifying a standard one.

The cost of such modifications must be discussed during the meeting.

Development of an individual house project.

  • Pros: all your wishes regarding all characteristics of the house and site are taken into account.
  • The downside is that the cost of such a project is higher than a standard one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free for you.

How is an individual project developed?

  • The development of an individual project begins with the signing of a contract and the first meeting with the architects, at which the client voices his wishes. Based on the results of the meeting, a design assignment is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move next. Over the entire design period, several meetings take place with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a working draft is developed. This is the calculation phase of each design solution in which the client is not involved.
  • This entire process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when submitting documents for a building permit.

About construction

Will you go to the site where construction is planned?

Yes. When inspecting the site, we take into account the size, access from the road and its width, the proximity of neighboring buildings, the presence of a slope or drop, cardinal directions and what kind of soil is on the site.

Do you help with choosing a site for construction?

Yes. Our specialists help with site selection. They will help you find it according to your requirements on the Internet with advertisements.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, entry conditions, location
  • materials used in construction
  • house architecture features
  • work conditions (working time restrictions)

What guarantees do you provide?

We provide a 3-year guarantee on our work. The manufacturer provides a guarantee for materials and it is different in each case. There are materials for which the manufacturer provides a lifetime warranty.

How can I control construction?

  • We send each client step by step photo work report.
  • We install online video surveillance of the facility 24 hours a day, you and the company’s specialists have access to it (paid service).
  • You can also use the services of companies that provide technical control.
  • The construction is carried out in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the estimate has been developed and approved.

When should I pay for your work?

For design, an advance payment is required within 5 days after signing the contract in the amount of 70% of total amount. The balance is paid upon delivery of the finished project to the client.

Payment for construction is broken down according to the stages specified in the estimate. Each stage of construction is also divided into payments, the size of which may vary (usually due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders near the construction site, suitable for garden house, construction trailer, an old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will accommodate our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a power of at least 5 kW and technical water.

If this is not the case, then we will bring our generators FREE OF CHARGE. In most cases, water wood construction used only for household needs, we will provide its delivery on our own.

What time of year do you carry out construction?

We build all year round, one of important conditions V spring-autumn period This is a suitable road for vehicle access.

Order help from a team of professionals passionate about construction!

Estimator visit;

Design of a house, bathhouse, garage;

Consultation on construction stages;

Roof type for your home

Shed - The simplest and most economical roof design. Requires minimal construction costs.

Hip - Suitable for large houses. The design can withstand high wind loads.

Half-hip - Option architectural solution For gable roof. The design becomes slightly more complicated.

Vaulted - Mainly used for non-residential commercial and industrial buildings of rectangular shape.

Hip roof - A type of hip roof. Ideal for square shaped houses.

Gable - The most common and no less economical option roofs.

Multi-gable - Ideal for square and polygonal houses.

Diamond - Consists of four sides in the shape of a diamond. Suitable for square shaped houses.

The Russian Brus company is pleased to welcome you to the pages of its website! Do you dream of something beautiful, comfortable and environmentally friendly? clean house? Then you are at the right address!

We specialize in the professional design and construction of houses and baths made of profiled timber. Behind long years We have successfully implemented hundreds of projects of varying complexity. Thanks to a powerful production base and a staff of highly qualified specialists, we will build your dream home in the shortest possible time. reasonable price with the highest quality guarantees!

View all reviews

Advantages of timber houses

Environmental friendliness, - wood is natural material, environmentally friendly and safe.
Aesthetics, - thanks to the natural richness of texture and the beauty of the natural color of wood timber houses always look presentable even with minimal finishing works.
Microclimate, - timber houses have a “breathing” effect; wood absorbs moisture from the air when there is excess of it and releases it back when the air becomes dry.
Thermal efficiency, - thanks to the low thermal conductivity of wood, log houses are easily and quickly heated in winter and retain heat for a long time, and in summer they give pleasant coolness, no matter how hot it is outside.
Favorable atmosphere, - in houses made of timber, a person feels physical and emotional uplift, tension and fatigue quickly pass, and sleep in a timber house is the healthiest.

Watch all videos

Choosing a foundation

The list of our construction works also includes the design and installation of a foundation, but we are ready to build timber house“shrinkable” or “turnkey” and on an existing foundation, but in this case, the project may need to be adapted.

The best options for foundations for timber houses are shallow strip and pile-screw. The choice of foundation depends on the design of the timber house, the topography of the building site and the bearing capacity of the soil. If you find it difficult to choose, our specialists will go to the site and do everything necessary measurements and calculations, and will provide reasonable recommendations on the choice between a pile-screw and strip foundation.

Log houses from Kostroma

To make your dream about country house has become a reality, it is enough to take a few steps towards it, and the Russian Brus company is the best guide on this path!

Step 1. Selecting a project. The website contains an electronic catalog of finished projects timber houses from Kostroma. You can choose the project you like from the database or order individual design. But individual approach may require additional financial and time expenses.

Step 2. Conclusion of a construction contract. After the project has been agreed upon and financial issues have been resolved, a contract for the construction of a log house is concluded, indicating the cost, volume and timing of the work. From now on you can start preparing for your housewarming party.

Step 3. Making a house kit. In the construction of timber houses we use exclusively quality wood from environmentally friendly Kostroma forests. Machine shops receive material that has passed strict quality control. Modern high-precision equipment produces profiled beams for floors, as well as all types of auxiliary construction and finishing materials.

Step 4. Construction of a timber house. A fully finished house kit arrives at the construction site. The assembly of a log house from Kostroma is carried out according to the Lego principle, and construction works take a minimum of time. The Russian Brus company offers two options for constructing a log house: “shrinkable” and “turnkey”. In the first option, we build only the frame of the house, and in the second we carry out a full range of construction and finishing works.