Evgenia Sergeevna Petrenko

The Sayano-Shushenskaya hydroelectric power station on the Yenisei River is
the largest hydroelectric power station in Russia and one of the largest hydroelectric power stations in the world. She
located on the border of the Krasnoyarsk Territory and Khakassia. Construction of hydroelectric power station
started in 1968, the first hydraulic unit was launched in 1978,
the last one was in 1985. The power plant was in constant operation
adopted in 2000.

Sayano-Shushenskaya
hydroelectric power plant gives 6400
MW of its capacity. By
statistical data, according to
average station for
year produces 24.5 billion kW/h. My
The hydroelectric power station reached its peak production in
2006, taking into account the increase
water level in the summer months,
26.8 billion were produced
kW/h

Late summer 2009
(17.08) at the station
an accident occurred.

The cause of the accident at the Sayano-Shushenskaya hydroelectric power station was inadequate quality
operation of the second hydraulic unit, due to which the entire turbine hall was flooded.
As a result, the seventh and ninth hydraulic units failed due to strong
damage. After which their debris destroyed hydraulic units from three to five,
and all this destroyed the engineering hall from which it was controlled
hydroelectric power station. As a result of the man-made disaster, 75 people died.

The main cause of the accident
name the station equipment,
the dam itself does not cause
doubts about your reliability.
The equipment is made of
quality material, but
doubts him
service after completion
warranty validity.
The turbine room of the Sayano-Shushenskaya HPP before the accident...
Upon thorough investigation
accidents at the Sayanno-Shushenskaya hydroelectric power station
The investigative committee concluded
that the accident was caused by an explosion
oil transformer.
...and after the accident

Economic losses after
suffered the most from the consequences of the accident at the Sayano-Shushenskaya hydroelectric power station
"Rus Hydro". The size of her loss reached
one and a half million rubles per month.
Rus Hydro lost 7%
investment only an hour after
accident at the station, and after the action and
They stopped selling altogether. For
restoration of consequences
hydroelectric power station will be needed
several billion rubles.
ECOLOGICAL CONSEQUENCES OF A HYDROPEL ACCIDENT:
damage to biological reserves
decrease in fish breeding quality
low self-cleaning ability
reduction in aesthetic benefit
terrain
There is information that after the accident in
Yenisei hit up to 40 tons of transformer
oil that destroyed about 400 tons
trout.

The reconstruction of the station lasted from
2010 to 2014.
In 2013, employees were able to
implement the launch
additional water
units numbered ten,
six and five that allowed
station boost energy to 4480
MW. Already in 2013, hydroelectric power station
produced 24 billion kWh.
During the entire period of reconstruction
produced after the disaster
complete refurbishment of the new
equipment from the manufacturer
"Power machines". Managed
extend the life of machines to
forty years old. For now
Sayano-Shushenskaya HPP in its entirety
is in good working order and works perfectly.

By clicking on the "Download archive" button, you will download the file you need completely free of charge.
Before downloading this file, think about those good essays, tests, term papers, dissertations, articles and other documents that are lying unclaimed on your computer. This is your work, it should participate in the development of society and benefit people. Find these works and submit them to the knowledge base.
We and all students, graduate students, young scientists who use the knowledge base in their studies and work will be very grateful to you.

To download an archive with a document, enter a five-digit number in the field below and click the "Download archive" button

Similar documents

    History of construction and economic significance of the Sayano-Shushenskaya hydroelectric power station for the economy of the Krasnoyarsk Territory, its capacity and composition of structures. Attempts to predict the 2009 accident at a hydroelectric power station. History of accidents from the start of operation and their consequences.

    course work, added 03/10/2010

    Level of development of hydropower in Russia and in the world. A complex of hydraulic engineering and fish protection structures, equipment, schematic diagrams of hydroelectric power plants. Accidents and incidents at hydroelectric power stations; social and economic consequences, environmental problems.

    abstract, added 02/15/2012

    Hydroelectric power station as an integral part of a hydroelectric complex. Water management and water energy complex. Efficiency of operation of a hydraulic turbine unit. Operational universal characteristics of a hydroelectric power station. Class of hydraulic structures.

    abstract, added 10/27/2014

    The operating principle and energy sources of hydroelectric power plants, factors of their efficiency. The largest and oldest hydroelectric power stations in Russia, their location, advantages and disadvantages of use. Major hydraulic accidents and incidents.

    presentation, added 12/14/2012

    Methodology for determining the potential power of a river flow by month. Calculation of the power of small hydroelectric power stations, taking into account restrictions on the cross-section of the water pipeline and hydraulic unit. The procedure and main stages of the process of calculating the annual electricity production of a small hydroelectric power station.

    test, added 09/06/2011

    Composition and layout of the main structures of a hydroelectric power station. Purpose of dams and gates. Design and layout of hydroelectric power station buildings, features of their classification. Reservoir, tailwater and their characteristics. Regulation of river flow by reservoirs.

    abstract, added 10/25/2013

    History of the development of hydroelectric power. Features of hydraulic engineering construction. Construction of turbine and mechanical parts of a hydroelectric power station. Communication and interaction with the energy system. Impact of hydropower construction on the environment.

    course work, added 02/12/2015

Sayano-Shushenskaya hydroelectric power station named after P. S. Neporozhniy

Completed by: history teacher of MBOU “Secondary School No. 65”, Kemerovo.

Trofimova Nadezhda Vladimirovna

Pyotr Stepanovich Neporozhny

Minister of Energy and Electrification of the USSR


Sayano-Shushenskaya HPP -

the largest power plant in Russia in terms of installed capacity,

8th among currently operating hydroelectric power plants in the world. It is located on the Yenisei River, on the border between the Krasnoyarsk Territory and Khakassia, near the village of Cheryomushki, near Sayanogorsk. It is the upper stage of the Yenisei cascade of hydroelectric power stations.


*The highest dam in Russia - 242 m high

*one of the highest dams in the world

* The name of the station comes from the names of the Sayan Mountains and the village of Shushenskoye located not far from the station

Western Sayan, Ergaki ridge



Natural conditions

The Sayano-Shushenskaya hydroelectric power station uses the fall of the upper Yenisei in the so-called Sayan corridor - a section of the flow where the river cuts through the ridges of the Western Sayans. The Sayan corridor has a length of about 280 km, starting at the confluence of the Khemchik River with the Yenisei and ending in the Sayanogorsk region. Within the Sayan corridor, the Yenisei flows in a narrow gorge; the river bed consists almost entirely of rapids and rifts.



Station design

The Sayano-Shushenskaya HPP is a powerful high-pressure dam-type hydroelectric power station. Structurally, hydroelectric power station structures are divided into a dam, a hydroelectric power station building with auxiliary buildings, a water well for the operational spillway, a coastal spillway, and an open switchgear.



Operational spillway

The operational spillway is designed to discharge excess water inflow during high water and floods, which cannot be passed through the hydraulic units of a hydroelectric power station or accumulated in a reservoir.

Operational spillway of the Sayano-Shushenskaya HPP in action (2010)


Coastal spillway

The coastal spillway is located on the right bank and is designed to pass floods of rare occurrence. Structurally, the spillway consists of a water intake structure, two free-flow tunnels, a five-stage drop and an outlet channel. The water intake structure is designed to collect water into the spillway.


Reservoir

When creating the reservoir, 35,600 hectares (according to other sources - 18,300 hectares) of farmland were flooded and 2,717 buildings were moved. The water of the reservoir is of high quality, which made it possible to organize fish farms specializing in trout cultivation in the downstream of the hydroelectric power station. The reservoir is located in Tuva, Khakassia and the Krasnoyarsk Territory.


At 8:13 local time on August 17, 2009, a serious accident (man-made disaster) occurred at the Sayano-Shushenskaya hydroelectric power station. Hydraulic unit No. 2, which was in operation, suddenly collapsed and was thrown out of its place by the pressure of water. Water began to flow into the station's turbine room under high pressure, flooding the turbine room and the technical rooms below it. At the time of the accident, the power of the station was 4100 MW, there were 9 hydraulic units in operation, the automatic protections on most of which did not work. The power supply for the station's own needs was lost, as a result of which the emergency repair valves at the water intakes (in order to stop the flow of water) had to be reset by the station personnel manually.



Restoration and reconstruction of the station

Emergency rescue work at the station was generally completed by August 23, 2009, after which work began to restore the station. The removal of the rubble in the turbine room was completed by October 7, 2009. The restoration of the walls and roof of the turbine hall was completed on November 6, 2009. At the same time, work was carried out to dismantle the damaged hydraulic units and restore building structures; the most damaged hydraulic unit No. 2 was finally dismantled in April 2010.





By clicking on the "Download archive" button, you will download the file you need completely free of charge.
Before downloading this file, think about those good essays, tests, term papers, dissertations, articles and other documents that are lying unclaimed on your computer. This is your work, it should participate in the development of society and benefit people. Find these works and submit them to the knowledge base.
We and all students, graduate students, young scientists who use the knowledge base in their studies and work will be very grateful to you.

To download an archive with a document, enter a five-digit number in the field below and click the "Download archive" button

Similar documents

    The accident occurred on August 17, 2009 at the Sayano-Shushenskaya hydroelectric power station. Analysis of damage during an accident. Costs of the Russian Ministry of Emergency Situations to eliminate the consequences of the accident. Major flood hazards. First medical aid for flood victims.

    abstract, added 10/16/2013

    The main causes of man-made disasters: human factor, labor discipline. A study of the social, economic and environmental aspects of a severe accident or disaster. Structure of direct, indirect, total damage from the accident at the Sayano-Shushenskaya HPP.

    test, added 01/26/2012

    Facts related to the technical aspects of the disaster at the Sayano-Shushenskaya hydroelectric power station. Cause-and-effect relationships of this accident. Destruction of the second hydraulic unit of a hydroelectric power station as a result of surge resulting from hydroacoustic resonance.

    abstract, added 09/13/2013

    Types of man-made disasters and their causes. Classification of man-made emergency situations. The accident at the Sayano-Shushenskaya hydroelectric power station as an example of a major man-made disaster in Russia. Man-made disasters abroad. The problem of nuclear energy in the USA.

    abstract, added 06/25/2013

    Consequences of industrial man-made disasters at the Sayano-Shushenskaya and Nurek hydroelectric power stations in the Russian Federation. Conducting an investigation by Rostekhnadzor and repair and restoration work at the hydroelectric power station. Causes of the accident at the collector in Berdsk.

    presentation, added 12/01/2013

    Technological (man-made) disaster and its types. Disasters in the air and at sea. Industrial disasters, Operation Castle Bravo. The threat of man-made disasters in Ukraine. Tragedy in the Lviv region. Major accidents in Ukrainian mines in 1991-2008.

    creative work, added 05/18/2010

    Global damage from emergency situations. Conditions for the occurrence of man-made emergencies. Man-made accident at the Chernobyl nuclear power plant. Types of disasters. Accidents with the release of biologically hazardous substances and their consequences.

    "Energy Crisis" - Global System. Possible post-crisis development scenarios. Crisis of the 2010s. Growing tensions. Dynamics of natural disasters. Global crisis. Contours of a new energy civilization. Global energy security crisis. Bubbles of the “virtual” economy. Dynamics of world energy development.

    “Development of Russian Energy” - The need to change the tax system. Expected innovative solutions in the coal industry. The need for innovative development of energy. The need to ensure an investment leap in the energy sector. Expected innovative solutions in the oil and gas industry. Energy strategy of Russia until 2030.

    "Energy Development" - Fuel of the future. Hydrogen. Greenhouse effect. Human society. Smog over the city. The key to the development of civilization. Energy sources. UN Convention on Climate Change. Damage to the natural environment. The influence of energy. Human life. Increase in incidence.

    “Energy service agreement” - Sample terms of an energy service agreement. Placement of orders for energy services. Administrative responsibility. Sample terms and conditions of an energy service agreement (contract). Service contracts. Requirements for the terms of an energy service contract. Decision-making. Energy service contracts. Article 19 of the Federal Law.

    “Power stations of Russia” - Beloyarsk nuclear power plant. Negative properties of hydroelectric power stations. Tasks of the Federal Tariff Service of Russia. Non-traditional energy sources. Kursk NPP. Energy. Hydroelectric power stations. The largest thermal power plant in Eurasia. Flaws. Positive properties of TES. Geothermal energy. Advantages. Nuclear power.

    “Energy” - To compensate for wind variability, huge “wind farms” are being built. An incomparably more powerful source of water flows is the ebb and flow of the tides. Energy of ebbs and flows. Wind power plants have been developed that can operate efficiently even in the lightest breeze. Alternative energy.

    There are 11 presentations in total